Projects
At Voet Energy Solutions, everything is about progress — in technology, sustainability, and collaboration. Every project we undertake addresses today’s energy needs while keeping an eye on tomorrow’s challenges. From temporary power solutions on construction sites to sustainable electricity supply for events and industry, our approach is always thoughtful, reliable, and tailor-made.

Working Together on the Energy of Tomorrow
On behalf of NRG (Dens, Alsema, and Van Vulpen), we are providing the electrical power for a unique, zero-emission drilling installation on the Maasvlakte.

Temporary Power Supply at OLVG Amsterdam During Maintenance
At OLVG in Amsterdam, we recently took over the power supply temporarily during scheduled maintenance — without interruptions and without any risk to patient care.

Temporary Power Supply During Maintenance at Center Parcs
Eight transformer stations at Center Parcs de Eemhof underwent major maintenance by Kenter. This meant shutting off all power. But a holiday park without electricity? That’s not an option.

Quick Response for Heijmans
In November, we received an urgent request from Heijmans: a flower auction had come to a standstill due to a damaged medium-voltage ring.

Zero-Emission Energy Solution On-Site
At Voet, we take steps every day to make zero-emission operations both achievable and scalable. After last year’s successful pilot project in Breda, we have now officially launched projects providing emission-free construction sites with tailored energy solutions.

New Wine Festival 2024
Just like last year, we once again provided a sustainable power supply for the New Wine Festival.

Quick Response and Delivery in Both Zeeland and France
In both Zeeland and France, we installed machines for TOP The Onion Group to help them overcome temporary energy shortages.

Synchronous Grid Transfer at TU Delft: Innovation in Action
At Voet Energy Solutions, we’ve reached an important milestone with our unique Wireless Synchronization Box. This innovative technology has now been successfully applied in our daily operations. This week marks a major achievement: together with Joulz, we carried out a successful synchronous grid transfer — both takeover and return — for TU Delft. This method has never before been applied anywhere in the world.

Phase 3 Energy Supply for Waste Processor in the Botlek
Over the past year, we have been working on the temporary energy supply for a waste processing facility in the Botlek. This project was set up to bridge the period until the new energy building is completed. Just like in Phase 2, we once again built an impressive scaffold structure.

The Olympic Games 2024 in Paris: Voet Was There!
Our client in Paris could not afford any power outages during the Olympic Games, so they opted for a redundant system.

Installations for Energy Partner Power4You During Festival Season
On July 5, the Dreamfields Festival kicked off — a large-scale event for which Power4You brought us in to jointly provide the energy supply. We delivered three twinsets and several 150 kVA generators to ensure an uninterrupted power supply.

Power Supply After Fire in LV Switchroom Parking Garage
At the end of June, a fire broke out in a temporary distribution unit in a parking garage in Houten. Upon arrival, our technician found that the LV switchroom had been completely destroyed and could not be restored. This switchroom supplied power to both the parking garage and a shopping center, which required a fast solution to restore the energy supply.

Power Outage in a 15-Storey Apartment Building in Central Amsterdam
A challenging fault: a power outage in a large part of a 15-storey apartment building in the heart of Amsterdam. The busbar, which transports energy from the transformer to the top floors, had failed.

Defective Medium-Voltage Cable at Brick Factory
Last week at 8:00 p.m. we received a call from Joulz; a defective medium-voltage cable had shut down the power supply at a brick factory in Walsoorden, Zeeland. An immediate 3150 kVA was needed, which had to be connected to the customer’s medium-voltage network.

Sports Park Heerenveen supplied with power during maintenance
The assignment from Joulz last week: ensuring that Sports Park Heerenveen — including the Abe Lenstra Stadium, swimming pool, Topsport Hall, sports hall, and hospital — would continue to have power during maintenance on the transformer station and the replacement of a medium-voltage switch.

Phase 2 – Power Supply for Waste Processor After Fire Incident
The project at a waste processing plant in the Botlek has entered a new phase. The construction of a new power building is a time-consuming and costly process. To bridge this period, the waste processor has decided to continue operating on a temporary power supply for the next six months. This means that, with the current setup, every kilowatt hour is still being generated by generators — which led to the ambition to (temporarily) reconnect to the main grid. To make this possible, Voet Energy Solutions implemented an innovative solution to safeguard the power supply. Curious about the technical aspects and challenges of this transition phase? Read on.

Voet Delivers Tailor-Made Power Solution for Waste Processor After Fire Incident
Voet Delivers Tailor-Made Power Solution for Waste Processor After Fire Incident in collaboration with Eqin.

Tijdelijke stroomoplossing voor werkzaamheden aan transformatorhuisje
Grid operator Liander has started the conversion of a transformer station in Hoorn. The work includes installing a new transformer, switches, and the low-voltage rack. To temporarily take over the existing electrical installation during the work, we supplied two temporary power modules (provisoriums).

Draadloze synchronisatie van 5MW bij Syngenta Seeds
For Syngenta Seeds in Enkhuizen, we supplied uninterrupted power for an entire week, ensuring that daily operations and processes could continue without disruption. Here’s how we made it happen.

Power Continuity Guaranteed: Voet Energy Solutions Delivers Temporary Power Solution for Florensis B.V.
In any business operation, a continuous power supply is essential. The importance of this becomes even clearer when planned maintenance on the electricity grid interrupts the normal supply — as was the case for Florensis. The grid operator announced work on the cables and transformer station, which meant that the power supply from the station would need to be shut down.

Temporary Infrastructure for Maintenance Works at St. Antonius Hospital Utrecht
Last month, major maintenance was carried out to safeguard the electrical operations of the main infrastructure at the St. Antonius Hospital, Utrecht location.

Sustainable Power Supply at the New Wine Festival
Each year, the New Wine Festival takes place for a week on the beautiful Landgoed Velder estate in Liempde, Brabant. For the fifth consecutive year, Voet Energy Solutions has been entrusted with providing the temporary power supply for the event.

Rapid Emergency Power Solution Commissioned by Enexis After Dike Breach in Maastricht
The water level of the Meuse River rose sharply, causing, among other things, a dike breach. The resulting surge of water sent a houseboat in a branch of the river adrift, which then collided with a bridge. The bridge was damaged, as was the medium-voltage cable running through it, which supplies power to the island and surrounding houseboats.

Power Supply to Vuurtoreneiland, Durgerdam Halted by High Water – Voet Restores Electricity
Power Supply to Vuurtoreneiland, Durgerdam Halted by High Water – Voet Restores Electricity

Emission-Free Drilling, Powered by Batteries
A unique, innovative project: emission-free drilling, fully powered by batteries using only green, renewable energy. In early September, TenneT began work on a project to partially underground two existing 150 kV overhead connections running through the Haagse Beemden and Wisselaar districts. The required drilling covers a length of 800 metres and will take several days to complete.

Project Schiphol – From 10kV to 400V at Schiphol
On behalf of BAM Energie & Water, we are supporting a major project at Schiphol. We supplied a medium-voltage temporary installation, a main switchboard, low-voltage distribution boards, and several (kilo)metres of cable.

Project Haga Hospital – Step-Up Transformer and NSA in The Hague
A faulty 10kV cable presents a much bigger risk for some organisations than for others. In a hospital, for example, an emergency power installation must always be available. That’s why last month we delivered a step-up transformer combined with an NSA at the Haga Hospital in The Hague.

Project De Kwakel – Sustainable Home, Sustainable Solution
In De Kwakel, Bas and Linda built a fully sustainable barn-style home. The plot used to be farmland — meaning no grid connection was available. Voet Energy Solutions worked with the homeowners to find a green and reliable emergency power solution.

20 MVA Installation for Major Power Outage in Venlo
As the morning sun broke through, it became clear just how much had been achieved in such a short time. During the night from Thursday to Friday, a major power outage occurred at a 150 kV station in Venlo. As a result, many companies in and around Fresh Park Venlo spent the night in darkness.

2500 kVA Bypass for Two Grid Transformers
Sometimes pictures say more than a thousand words — but here’s a small piece of craftsmanship from our technicians. Last week, we installed a bypass for two grid transformers, each rated at 2500 kVA.

Emergency Power after Flooding in Limburg
On behalf of Enexis Netbeheer, Voet Energy Solutions installed 11 emergency power generators in Valkenburg last week.

Successful Grid Takeover with the New Generation Stage 5 Diesel Engines
Last week, Voet successfully carried out the first synchronous grid takeover using two brand-new John Deere 6090CG550 Stage 5a engines. The takeover took place within the electricity network of grid operator Liander and was supervised by contractor Van den Heuvel.

Power Supply on Texel
Two of our Super Silent Twinset generators are currently running on Texel to provide power to a campsite on the island.

Emergency Power for Rijnstate Hospital
In early 2019, Voet Energy Solutions received a request from Croonwolter&dros to deliver a temporary 4 MVA emergency power installation for Rijnstate Hospital in the Arnhem region.

Operations at Lelystad Airport
Due to work on the power supply at Lelystad Airport, Voet Energy Solutions installed three generators for an extended period.

Emergency Power for Jumbo's Cooling System
Due to the high temperatures in recent weeks, Jumbo's cooling system required additional capacity.

Power for the Festival Season
During this sunny festival season, we installed several generators for Power4you.

Twenty Generators for Walibi
For Walibi Flevoland, we installed around twenty generators for a temporary event.

Malfunction at a Port Terminal
On a Sunday afternoon, we received a report of a transformer failure at a port terminal in Rotterdam.

Emergency Power Supply Urgent Response
Due to a burned-out 2 MVA transformer room, Voet urgently installed a temporary emergency power system.

Maintenance of 10kV Network at Diergaarde Blijdorp
Due to maintenance work on the medium-voltage installation at Diergaarde Blijdorp, the entire medium-voltage system had to be powered down.

Power for Work on the Water
For De Jong Zuurmond, we installed an emergency generator on a ship.

Power Outage in Amsterdam
One by one, all generators are now returning from Amsterdam. Last Friday and Saturday, we urgently deployed several units to support the low-voltage network.

Faulty Medium-Voltage Installation
On New Year’s Day, we received a report of a power failure in Veenendaal. For Lantor, located right in the city center, we urgently installed a 1000 kVA emergency power unit.

Rotterdam Marathon
A few hours before the start of the Rotterdam Marathon, we installed temporary power units at various locations along the route. These generators are used to supply power for catering, food trucks, and entertainment during the event.

Power Supply for Feyenoord Stadium
We regularly provide backup power with Voet on standby during international matches at the Feyenoord stadium.

Maintenance Air Traffic Control Tower Schiphol
A great challenge to work together with Schiphol's technical maintenance department to provide power to the air traffic control tower.