Bei Voet Energy Solutions dreht sich alles um Fortschritt – in Technik, Nachhaltigkeit und Zusammenarbeit. Jedes Projekt, das wir realisieren, ist eine Antwort auf die Energiefragen von heute, mit Blick auf die Herausforderungen von morgen. Von temporären Energielösungen auf der Baustelle bis hin zu nachhaltigen Stromversorgungen für Veranstaltungen und Industrie: Unser Ansatz ist stets durchdacht, zuverlässig und maßgeschneidert.

Phase 3 Energy Supply for Waste Processor in the Botlek
Over the past year, we have been working on the temporary energy supply for a waste processing facility in the Botlek. This project was set up to bridge the period until the new energy building is completed. Just like in Phase 2, we once again built an impressive scaffold structure.

Defective Medium-Voltage Cable at Brick Factory
Last week at 8:00 p.m. we received a call from Joulz; a defective medium-voltage cable had shut down the power supply at a brick factory in Walsoorden, Zeeland. An immediate 3150 kVA was needed, which had to be connected to the customer’s medium-voltage network.

Phase 2 – Power Supply for Waste Processor After Fire Incident
The project at a waste processing plant in the Botlek has entered a new phase. The construction of a new power building is a time-consuming and costly process. To bridge this period, the waste processor has decided to continue operating on a temporary power supply for the next six months. This means that, with the current setup, every kilowatt hour is still being generated by generators — which led to the ambition to (temporarily) reconnect to the main grid. To make this possible, Voet Energy Solutions implemented an innovative solution to safeguard the power supply. Curious about the technical aspects and challenges of this transition phase? Read on.

Voet Delivers Tailor-Made Power Solution for Waste Processor After Fire Incident
Voet Delivers Tailor-Made Power Solution for Waste Processor After Fire Incident in collaboration with Eqin.

2500 kVA Bypass for Two Grid Transformers
Sometimes pictures say more than a thousand words — but here’s a small piece of craftsmanship from our technicians. Last week, we installed a bypass for two grid transformers, each rated at 2500 kVA.

Malfunction at a Port Terminal
On a Sunday afternoon, we received a report of a transformer failure at a port terminal in Rotterdam.