Projects
At Voet Energy Solutions, everything is about progress — in technology, sustainability, and collaboration. Every project we undertake addresses today’s energy needs while keeping an eye on tomorrow’s challenges. From temporary power solutions on construction sites to sustainable electricity supply for events and industry, our approach is always thoughtful, reliable, and tailor-made.

Temporary Power Supply at OLVG Amsterdam During Maintenance
At OLVG in Amsterdam, we recently took over the power supply temporarily during scheduled maintenance — without interruptions and without any risk to patient care.

Quick Response for Heijmans
In November, we received an urgent request from Heijmans: a flower auction had come to a standstill due to a damaged medium-voltage ring.

Synchronous Grid Transfer at TU Delft: Innovation in Action
At Voet Energy Solutions, we’ve reached an important milestone with our unique Wireless Synchronization Box. This innovative technology has now been successfully applied in our daily operations. This week marks a major achievement: together with Joulz, we carried out a successful synchronous grid transfer — both takeover and return — for TU Delft. This method has never before been applied anywhere in the world.

Draadloze synchronisatie van 5MW bij Syngenta Seeds
For Syngenta Seeds in Enkhuizen, we supplied uninterrupted power for an entire week, ensuring that daily operations and processes could continue without disruption. Here’s how we made it happen.

Temporary Infrastructure for Maintenance Works at St. Antonius Hospital Utrecht
Last month, major maintenance was carried out to safeguard the electrical operations of the main infrastructure at the St. Antonius Hospital, Utrecht location.

Successful Grid Takeover with the New Generation Stage 5 Diesel Engines
Last week, Voet successfully carried out the first synchronous grid takeover using two brand-new John Deere 6090CG550 Stage 5a engines. The takeover took place within the electricity network of grid operator Liander and was supervised by contractor Van den Heuvel.

Maintenance of 10kV Network at Diergaarde Blijdorp
Due to maintenance work on the medium-voltage installation at Diergaarde Blijdorp, the entire medium-voltage system had to be powered down.