Projects
At Voet Energy Solutions, everything is about progress — in technology, sustainability, and collaboration. Every project we undertake addresses today’s energy needs while keeping an eye on tomorrow’s challenges. From temporary power solutions on construction sites to sustainable electricity supply for events and industry, our approach is always thoughtful, reliable, and tailor-made.

Temporary Power Supply at OLVG Amsterdam During Maintenance
At OLVG in Amsterdam, we recently took over the power supply temporarily during scheduled maintenance — without interruptions and without any risk to patient care.

Temporary Power Supply During Maintenance at Center Parcs
Eight transformer stations at Center Parcs de Eemhof underwent major maintenance by Kenter. This meant shutting off all power. But a holiday park without electricity? That’s not an option.

Synchronous Grid Transfer at TU Delft: Innovation in Action
At Voet Energy Solutions, we’ve reached an important milestone with our unique Wireless Synchronization Box. This innovative technology has now been successfully applied in our daily operations. This week marks a major achievement: together with Joulz, we carried out a successful synchronous grid transfer — both takeover and return — for TU Delft. This method has never before been applied anywhere in the world.

Phase 3 Energy Supply for Waste Processor in the Botlek
Over the past year, we have been working on the temporary energy supply for a waste processing facility in the Botlek. This project was set up to bridge the period until the new energy building is completed. Just like in Phase 2, we once again built an impressive scaffold structure.

Power Supply After Fire in LV Switchroom Parking Garage
At the end of June, a fire broke out in a temporary distribution unit in a parking garage in Houten. Upon arrival, our technician found that the LV switchroom had been completely destroyed and could not be restored. This switchroom supplied power to both the parking garage and a shopping center, which required a fast solution to restore the energy supply.

Power Outage in a 15-Storey Apartment Building in Central Amsterdam
A challenging fault: a power outage in a large part of a 15-storey apartment building in the heart of Amsterdam. The busbar, which transports energy from the transformer to the top floors, had failed.

Phase 2 – Power Supply for Waste Processor After Fire Incident
The project at a waste processing plant in the Botlek has entered a new phase. The construction of a new power building is a time-consuming and costly process. To bridge this period, the waste processor has decided to continue operating on a temporary power supply for the next six months. This means that, with the current setup, every kilowatt hour is still being generated by generators — which led to the ambition to (temporarily) reconnect to the main grid. To make this possible, Voet Energy Solutions implemented an innovative solution to safeguard the power supply. Curious about the technical aspects and challenges of this transition phase? Read on.

Voet Delivers Tailor-Made Power Solution for Waste Processor After Fire Incident
Voet Delivers Tailor-Made Power Solution for Waste Processor After Fire Incident in collaboration with Eqin.

Draadloze synchronisatie van 5MW bij Syngenta Seeds
For Syngenta Seeds in Enkhuizen, we supplied uninterrupted power for an entire week, ensuring that daily operations and processes could continue without disruption. Here’s how we made it happen.

Temporary Infrastructure for Maintenance Works at St. Antonius Hospital Utrecht
Last month, major maintenance was carried out to safeguard the electrical operations of the main infrastructure at the St. Antonius Hospital, Utrecht location.

Project Schiphol – From 10kV to 400V at Schiphol
On behalf of BAM Energie & Water, we are supporting a major project at Schiphol. We supplied a medium-voltage temporary installation, a main switchboard, low-voltage distribution boards, and several (kilo)metres of cable.

2500 kVA Bypass for Two Grid Transformers
Sometimes pictures say more than a thousand words — but here’s a small piece of craftsmanship from our technicians. Last week, we installed a bypass for two grid transformers, each rated at 2500 kVA.

Emergency Power for Jumbo's Cooling System
Due to the high temperatures in recent weeks, Jumbo's cooling system required additional capacity.

Emergency Power Supply Urgent Response
Due to a burned-out 2 MVA transformer room, Voet urgently installed a temporary emergency power system.